In Germany, 15 minutes determine your entire grid fees for 12 months. One forgotten machine start, one simultaneous equipment ramp-up – and your electricity bill explodes.
Additional cost per MW peak – every year, for just 15 minutes of inattention
Your grid fees are measured at your highest 15-minute peak of the year. One mistake, 365 days of penalty.
These scenarios cost companies thousands of euros daily
A single 15-minute peak determines your grid fees for 12 months. €2,400 per MW – recurring every year.
+€15,000/year
HVAC, EV charging, and production start simultaneously. Nobody sees the peak coming – until the bill arrives.
Flying blind
Machines, compressors, and cooling systems run uncoordinated. Flexible loads are not optimized.
+€12,000/yearProactive warning instead of reactive billing
Our AI detects incoming peaks 15 minutes before they happen. Enough time to take countermeasures.
96h forecast
Flexible loads are automatically throttled or delayed – without production interruption.
-30% peaks
Battery storage actively shaves demand peaks. The peak is caught, not billed.
€2,400/MW savedEnterprise-grade load management for industry and commerce
Exact interval measurement – just like your grid operator. No more surprises.
Seamless connection of battery storage for active peak shaving.
Bidirectional grid connection for active participation in balancing markets.
Detailed breakdown of all avoided peaks and cost savings.
Optimized machine runtimes based on load forecast and tariffs.
Calculate your individual savings potential in seconds.
Our AI phone assistant analyzes your savings potential in minutes. No sales pitch, just facts.
Common questions about peak load management
In Germany, grid fees are calculated based on the highest 15-minute average of the year. This peak determines your capacity charges for 12 months – even if it only occurs once.
For each avoided MW peak, you save approx. €2,400/year in grid fees. Typical industrial operations with 2-5 MW connections can save €30,000-€80,000/year.
No, we integrate with your existing infrastructure (Modbus, OPC-UA, PLC). Often a software upgrade to your energy management system is sufficient.
No. We only control flexible loads like HVAC, charging infrastructure, or compressed air systems. Critical production processes remain untouched.
Typically under 12 months. With high demand peaks and large connections, often within 6 months.
Yes, optimally even! BESS can actively "shave" demand peaks by injecting power when needed. Peaks are never recorded in the first place.